Hydro Connection Investigation

draw3

Impartially evaluate a mixture of developer and transmission company proposed options for connecting a series of eight hydro stations into the existing transmission network. Analysis included load flow modelling and discussion, protection scheme analysis and recommendations, and comparative costs estimates.